|
|
 |
|
Cork Flooring Installation
Cork Installation
View PDF Version
Preperation
Inspection : Prior to installation, inspect planks in daylight for visible faults/damage, check if sub floor/site conditions comply with the specifications described in these instructions, if you are not satisfied do not install, and contact your supplier. Floors installed with any visible defects automatically void any and all manufactures warranty.
Tools and materials required:
- electric saw
- spacers
- pencil
- set square
- PE film
- adhesive tape.
Before laying:
Measure the room at right angle to the direction of the planks
Planks in the final row should be at least 5 cm wide (2”).
For this purpose, planks in the first row can be cut to smaller size • shuffle planks in order to obtain a pleasant blend of shades.
Lay planks preferably following the direction of the main source of light.
We recommend laying on wooden floors crossways to the existing floorboard.
Planks must not be nailed or screwed to the sub floor.
skirting boards must not be fixed in a way which restricts the movement of the floor.
Expansion gaps:
Provide 10 mm (3/8”) expansion gaps to the walls and other fixed objects.
Areas greater than 100 m² (900 sq. ft) or 10 m (30 feet) in either direction, transitions between rooms and asymmetrical areas require extra expansion gaps.
|
|
 |
|
|
|
|